Publications

10/12/2025

The First Batch of Hitachi Mining Trucks









At the Almalyk Mining and Metallurgical Complex (AMMC), the first batch of Hitachi mining trucks with a 220-ton payload capacity has been commissioned.

The delivery and large-unit assembly of the equipment were carried out by RWS Optimum LLC. This milestone was more than a technical upgrade — it reflects deeper transformations in the enterprise’s logistics and production infrastructure.

The partnership between AMMC JSC and RWS Optimum LLC demonstrates the successful integration of the private sector into the development of large-scale industrial infrastructure. Collaborating with reliable domestic partners has become a strategic tool for improving operational efficiency, with such projects serving as a model for future effective cooperation.

This is particularly important for AMMC, where the scale of mining operations demands equipment capable of handling high loads and complex terrain.

Moreover, the involvement of private companies in the supply and assembly of machinery contributes to the development of domestic expertise — from engineering solutions to maintenance and service capabilities.

The delivery and assembly of Hitachi mining trucks is not merely a fleet upgrade. It exemplifies how targeted technological solutions can drive systemic improvements: accelerating production processes, strengthening logistics, fostering local competencies, and enhancing the resilience of the enterprise amid global challenges.

Assembled using large-unit technology, the Hitachi dump trucks meet international safety standards and demonstrate exceptional reliability. Their 220-ton payload capacity significantly increases the volume of rock mass transported, reducing the number of trips and improving overall quarry operational efficiency.